Description City Services Characteristics
1. Alteration of the development plan "Steinkaut business area" in Rockenhausen Rockenhausen
RP
  • Site development plan
  • Environmental management planning contribution
  • Surveying
  • 8.4 ha total area
  • 4.7 ha PV area
  • ca. 11,200 inhabitants
2. Alteration of the land use development plan of the Wörrstadt association of municipalities - "large scale solar park" Wörrstadt
RP
  • Land use development plan alteration
  • Environmental report
  • Area: 17,4 ha
  • ca. 28,000 inhabitants
Albessen solar park - cable route planning Albessen
RP
  • Planning of engineering structures
  • Planning of technical equipment
  • Route search with 4 options
  • Approval applications for rail, water ways, motorways, state and regional roads and gas pipes
  • Land-crossing rights for the entire route
  • Implementation planning with surveying stake lists for the cable route
  • Route search with 4 options
  • Land-crossing rights for 77 plots of land
  • ecological consideration of the entire route
  • Application for protected status permission
  • 9 horizontal flush drillings in the crossing areas
  • implementation planning of the cable route with ca. 9.5 km cable length and ca. 30 connection sleeves
  • 20 kV medium voltage cable 3 x 1 x 185 mm² NA2XS(F)2Y
Analysis of potential benefits and conflicts around renewable energy as part of the landscape plan Sprendlingen-Gensingen
RP
  • Landscape plan
  • Potential opportunities and conflict analyses
  • Total area ca. 5.600 ha
  • ca. 14,000 inhabitants
Biomass power station - Enkenbach-Alsenborn Enkenbach-Alsenborn
RP
  • Overall planning (in line with s. 4 of the Federal Pollution Control Act (BImSchG))
  • Construction supervision
  • Project management
  • Turbine output dynamic up to 2.6 MW  
  • Heat extraction dynamic up to 3.0 MW
  • Steam production 11.5 MW
  • 25,000 t/a renewable raw materials
Biomass power station - Kaiserslautern Kaiserslautern
RP
  • Planning of engineering structures
  • Stuctural engineering
  • Technical equipmentg
  • Surveying services
  • Project management
  • 25,000 MWh/a power output  
  • 4,000 MWh/a heating capacity
  • 20,000 t/a fuel wood (class A I and A II)
  • 800 Nm³/h landfill/biogas
Boms-Haggenmoos solar park, cable route planning Boms-Haggenmoos
BW
  • Planning of engineering structures
  • Planning of technical equipment
  • Approval applications for railway line 4551
  • Approval application for the L 286 road
  • Crossing application for railway line 4551
  • Crossing application for main road 286
  • 2 horizontal flush drillings in the crossing areas
  • Cable length: ca. 900 m
  • Cable specification: 1 x 150 mm² NA2XS(F)2Y
Development of the available renewable energy potential and integrated heat use in the local communities Rockenhausen
RP
  • Preparation of an energy and CO2 balance sheet
  • Analysis of regional potential development
  • Stakeholder engagement through workshops and individual discussions
  • Development of a list of actions
  • Creation of a management system including conflict management
  • Designing public relations work
  • ca. 11,200 inhabitants
Economic efficiency study for a ground mounted solar park Krk
  • Clarification for background conditions
  • Economic efficiency study
  • Finance possibilities
  • Size of the investigation area: 2,000 ha
  • Economic efficiency study from 36 options with plant sizes    of 1 MWp, 3 MWp und 5 MWp
Eggersdorf solar park - cable route planning Müncheberg
BB
  • Planning of engineering structures
  • Planning of technical equipment
  • Approval applications for federal roads, regional roads, gas pipes
  • land-crossing rights for the entire route
  • Implementation planning with surveying stake lists for the cable route
  • route search with 5 options
  • securing land-crossing rights with 34 plots of land
  • Crossing applications for federal roads, regional roads, parallel routes for gas pipelines
  • ecological consideration of the entire route
  • Application for protected status permission
  • 3 horizontal flush drillings in the crossing areas
  • implementation planning of the cable route with ca. 13.5 km cable length and ca. 20 connection sleeves
  • 20 kV
  • Medium voltage cable 2x3x1 NA2XS(F)2Y 630 mm²
Investigation of various alternative heating systems Krk
  • Data collection and evaluation
  • Price development scenarios for a variety of fuel types
  • Needs assessment by means of the consumption data and the existing buildings
  • Efficiency scenarios
  • Analysis of the respective operating costs
  • investment and finance plan
  • ca. 6,500 inhabitants
Overall locality strategy for wind farms in the Herxheim association of municipalities Herxheim
RP
  • Investigation for wind energy sites
  • Land use development plan
  • environmental report
  • ca.  4.995 ha investigation area
  • ca. 14,600 inhabitants
Overall locality strategy for wind energy use Offenbach an der Queich
RP
  • Overall site strategy for wind energy
  • Preparation of land use development plan alteration
  • Obtaining the regional planning position statement
  • Carrying out the required public participation procedures
  • Preparation of an envirionmental report
  • 4.564 ha investigation area  
  • ca. 6,200 inhabitants
Overall locality strategy for wind farms in the Alsenz-Obermoschel association of municipalities Alsenz-Obermoschel
RP
  • Investigation for wind energy sites
  • Land use development plan
  • environmental report
  • ca.  10.298 ha investigation area
  • ca. 6,800 inhabitants
Overall locality strategy for wind farms in the Annweiler am Trifels association of municipalities Annweiler am Trifels
RP
  • Investigation for wind energy sites
  • Land use development plan
  • environmental report
  • ca.  12.986 ha investigation area
  • ca. 16,600 inhabitants
Overall locality strategy for wind farms in the Freinsheim association of municipalities Freinsheim
RP
  • Investigation for wind energy sites
  • Land use development plan
  • environmental report
  • ca.  6.072 ha investigation araea
  • ca. 15,400 inhabitants
Overall locality strategy for wind farms in the Glan-Münchweiler association of municipalities Glan-Münchweiler
RP
  • Investigation for wind energy sites
  • Land use development plan
  • environmental report
  • ca. 7.782 ha investigation area
  • ca. 9,400 inhabitants
Overall locality strategy for wind farms in the Hettenleidelheim association of municipalities Hettenleidelheim
RP
  • Investigation for wind energy sites
  • Land use development plan
  • environmental report
  • ca. 4.031 ha investigation area
  • ca. 10,600 inhabitants
Overall locality strategy for wind farms in the Landau-Land association of municipalities Landau
RP
  • Investigation for wind energy sites
  • Landuse development plan
  • environmental report
  • ca.  9.043 ha investigation area
  • ca. 13,800 inhabitants
Overall locality strategy for wind farms in the Otterbach association of municipalities Otterbach
RP
  • Investigation for wind energy sites
  • Land use development plan
  • Environmental report/scoping study for species protection
  • ca. 4.717 ha investigation area
  • ca. 9,300 inhabitants
Overall locality strategy for wind farms in the Pirmasens-Land association of municipalities Pirmasens
RP
  • Investigation for wind energy sites
  • Land use development plan
  • environmental report
  • ca. 14.303 ha investigation area
  • ca. 12,500 inhabitants
Overall locality strategy for wind farms in the Rockenhausen association of municipalities Rockenhausen
RP
  • Investigation of the exclusion-free areas for wind energy use
  • Creation of a ranking list of suitable sites
  • Line of sight analysis and GIS visualisation
  • ca. 14.077 ha investigation ares
  • ca. 12,200 inhabitants
Overall locality strategy for wind farms in the town of Bad Schwalbach Bad Schwalbach
RP
  • Investigation for wind energy sites
  • Land use development plan
  • environmental report
  • ca.  4.027 ha investigation area
  • ca. 10,400 inhabitants
Overall locality strategy for wind farms in the town of Landau Landau
RP
  • Investigation for wind energy sites
  • Land use development plan
  • environmental report
  • ca.  8.294 ha investigation area
  • ca. 43,600 inhabitants
Pre-feasibility study on biomass Krk
  • Material flow analysis
  • Stakeholder and networks analysis
  • Summary of potential for development
  • Rough technical design
  • Commercial feasibility investigation and scenario analysis
  • Consultancy services and project management
  • ca. 20,000 inhabitants
Site investigation in Wörrstadt Wörrstadt
RP
  • Investigation for wind energy sites
  • Land use development plan
  • environmental report
  • ca.  11.264 just checking that this should be 11 hectares and not 11,000 (similarly with all the areas in the next 10 or so boxes below) ha investigation area
  • ca. 28,000 inhabitants
Solar park on the waste reception hall at Treskavac Krk
  • Project management
  • Overall project planning
  • Authorisation processes
  • Tendering processes
  • On-site construction supervision
  • ca. 934 m² roof area  
  • ca. 136.8 kWP
  • ca. 169,886 kWh solar power yield
Wind locality investigation in the Sprendlingen-Gensingen association of municipalities Sprendlingen-Gensingen
RP
  • Investigation for wind energy sites
  • Land use development plan
  • Expert paper on species protection and compatibility study on bird sanctuary
  • ca. 5.605 ha investigation area
  • ca. 14,000 inhabitants
Worms wind park 2 - cable route planning Pfeddersheim
RP
  • Planning of engineering structures
  • Planning of technical equipment
  • Route search with 3 options
  • Approval applications for rail, water ways, motorways, state and regional roads and gas pipes
  • Land-crossing rights for the entire route
  • Implementation planning with surveying stake lists for the cable route
  • On-site construction supervision
  • Building and as-build surveying
  • As-built documentation and plans
  • Route search with 3 options
  • Land-crossing rights for ca. 25 private estates
  • Crossing applications for rail, and industrial rail tracks, waterways, motorways, main and district roads and gas pipelines
  • Ecological study of the entire route
  • Application for protected status permission
  • 9 horizontal flush drilling in the crossing regions
  • On-site construction supervision
  • Implementation planning for the cable route with
3x1x150 mm² NAXS(F)2Y = ca. 3.9 km cable length
3x1x400 mm² NAXS(F)2Y = ca. 10.3 km cable length
3x1x500 mm² NAXS(F)2Y = ca. 7.9 km cable length
Zero emissions strategy for the intergrated development of the island of Krk, Croatia Krk
  • Identification of key individuals in the region and establishment of a network
  • Detailed analysis of the Ist conditions (energy and material flows)
  • Analysis of regional potential (the potential of efficient and renewable energy)
  • Development of a zero-emissions strategy
  • Project-related external communication
  • ca. 20,000 inhabitants