Masterpläne

Master plan and specialist planning for the infrastructure development of a holiday resort, Luštica Bay, Montenegro

On the Luštica peninsular on the Montenegrin coast, the Luštica Development AD company is developing an exclusive holiday resort on a more than 700 ha site near the coastal town of Tivat. 8 hotels, 1,600 apartments, ca. 750 villas, 2 marinas, a conference centre, a 18-hole golf course, and various centres with shopping, gastronomic, and medical facilities, a school and much more will be built. The investor sets great store on the resort being a sustainable development.

igr prepared the master plan for the infrastructure for the first development phase (ca. 440 ha). Detailed specialist designs were also drawn up for the the first development phase (phase 1). This phase included the building of a marina, villas in proximity to the habour, the marina hotel and the 18-hole golf course.

Services provided by igr

  • Master plan for engineering constructions (waste water, storm water, gas supply, drink water, fire extinguishing water, and irrigation)
  • Master plan for traffic infrastructure
  • Master plan for technical equipment (energy generation and distribution, telecommunications)
  • Master plan for innovative infrastructure taking into account materials/resources recirculation (waste water purification for irrigation purposes, combined heat and power plant for supply/emergency power security, photo voltaic, wind energy)
  • Preliminary design
  • Conceptual design for phase 1