Description City Services Characteristics
Aviano Air Base Aviano
  • Rehabilitation of aircraft operation areas
Briest/Brandenburg airport Brandenburg an der Havel
BB
  • Creation of a development strategy for the regional airport
  • Feasibility study (aviation legalities, technical, nature conservation legalities, contaminated sites and economic)
  • Planning of engineering structures
  • Planning of traffic facilities
  • In each case up until the design planning stage
  • 100,000 m2 aircraft operation surfaces
  • 60,000 m2  development roads/carparks
  • 4,500 m waste water and rainwater sewers
  • 4,200 m water pipes
Chièvres Air Base Chièvres
  • Management, control and support of the planning
  • Consideration of the technical requirements on the basis of the ICAO, the Nato STANAG and the US Air Force regulations
  • Time and cost controls
  • Consideration of the safety-relevant concerns for planning and implementation
  • 2,600 m runway length including overrun area, 45 m runway width
  • 500 m taxiways
  • 7,000 m ducting systems
  • 6,000 m drainage pipes
Complete renovation and upgrading of runway (runway 09/27) on Ramstein Air Base Ramstein-Miesenbach
RP
  • Project management
  • Aviation law authorisation process in line with s. 6 Aviation Law (LuftVG) in conjunction with s. 30 LuftVG
  • Process support
  • Environmental management supplimentary planning
  • FFH impact assessment
  • Environmental impact assessment
  • Species protection measures
  • Planning of outdoor facilities
  • Planning of engineering structures
  • Planning of traffic facilities
  • Planning of technical equipment
  • Design and construction surveying
  • As-built documentation
  • 3,400 m runway length, including    overrun area
  • 45 m runway width
  • 300 m taxiways
  • 11,500 m ducting systems
  • 1,000 m drainage pipes
  • 1,800 m roads and paths
  • 1,500 ha environmentally managed   investigations area
  • 80 ha intervention area
  • 140 ha compensation measures
Connecting the Sembach Air Base to the Winnweiler collective waste water treatment plant Sembach
RP
  • Condition assessement of aircraft operation surfaces study
  • Study of the entire water supply system
  • District heating system for housing and administration area
  • Waste water /surface water, hydraulic calculation
  • Rehabilitation of the waste water sewer system
  • Water law authorisations and discharge approvals
  • Rainwater retention basins with pumping station
  • Environmental management supplimentary plan
Construction of a fire service practice facility on Ramstein Air Base Ramstein-Miesenbach
RP
  • Planning of an open retention basin for collection and re-use of fire extinguishing water
  • Planning of a three-story 'fire house' using a   pre-fabricated construction
  • Planning ducting, lighting and power supply cable,   lighting masts, supply tunnel
  • Planning of drainage facilities (surface and   fire extinguishing water)
  • Technical equipment for a conflagration and nine fire scenes of various types in the mock-up
  • 2,800 m² tarmac surfaces
  • 5,000 m² concrete surfaces
Construction supervision of airside facilities at Berlin Brandenburg International airport Berlin
BB
  • Inspection planning and tendering
  • On-site construction supervision
  • Additional specific services
  • 8 rapid exit taxiways
  • Dismantling of 520,000 m² aircraft operation surfaces
  • 9 million m³ earth moving large-scale groundworks
  • Extension of the existing south runway 
  • 4,000 m new build of a runway (Cat II/III)
  • 12 km new build of taxiways
  • 1,500,000 m² new build apron including aircraft fuel supply
  • drainage systems
9 km pressure sewage pipework
22 km gravity sewage pipework
  • 8 pumping stations, 12.7 m³/s total capacity
  • 250,000 m³ soil filtration
  • Airport security fence, automatic gates and surveillance equipment   
Expert report regarding the current condition of the building fabric at Dresden airport Dresden
SN
  • Condition survey
  • Evaluation and expert opinion
  • 200,000 m² runways
  • 125,000 m² Taxiways
Hahn airport Lautzenhausen
RP
  • Waste water disposal
  • Feasibility study of the waste water treatment plant
Marseille Air Base Marseille
  • Tank storage facility and apron rehabilitation
Moron Air Base Moron
  • Rehabilitation and renewal of the Warm Up Pads
Recording the condition of the aircraft movement areas at "Baden Air Park" airport Hügelsheim
BW
  • Development of a Pavement Management System
  • Research, on-site inspection and condition survey
  • Evaluation
  • Annually repeated on-site inspection
  • Taking on of reported damage indicators to the aircraft operation surfaces
  • 191,000 m² runways, tarmac
  • 215,000 m² taxiways, tarmac
  • 39,000 m² taxiways, concrete
  • 11,000 m² carparks, tarmac/semi-ridig coatings
  • 54,000 m² carparks, concrete (mainly German Water Resources Act (WHG) areas)
Runway lighting and outside parking places (or aprons?) on the Neiderstetten Air Base Niederstetten
BW
  • Planning of engineering structures
  • Planning of technical equipment
  • Site management
  • On-site construction supervision
  • Project support
  • Customising of the drainage systems 3,900 m length
  • Renovation of the parking areas 17,000 m²
  • Renovation of the underground refuelling system 1,500 m length, 4 underground refuelling pits
  • Renewal of the airfield lighting, 22,000 m of cable routes
Spangdahlem Air Base Spangdahlem
RP
  • Condition assessement of aircraft operation surfaces study
  • Renewal of power distribution system
  • Landscaping study
  • Parking areas
  • North-west extension
  • Fire service practice facilities
  • Environmental management supplimentary plan
Upgrading of a Hot Cargo Pad on Ramstein Air Base Ramstein-Miesenbach
RP
  • Project management
  • Aviation law authorisation process in line with s. 6 Aviation Law (LuftVG) in conjunction with s. 30 LuftVG
  • Process support
  • Environmental management supplimentary planning
  • FFH impact assessment
  • Environmental impact assessment
  • Species protection measures
  • Planning of outdoor facilities
  • Planning of engineering structures
  • Planning of traffic facilities
  • Planning of technical equipment
  • Design and construction surveying
  • As-built documentation
  • Site management
  • On-site construction supervision
  • 42,700 m² aircraft parking apron
  • 15,500 m² taxiways
  • 2,000 m drainage pipes
  • 2,500 m ducting systems
  • 1,500 m water supply pipework
  • 2,300 m fuel supply pipes
  • 4 refuelling pits
  • Apron lighting with two 40m high lighting masts
Upgrading of Aprons 3 and 4E at Leipzig airport Leipzig
SN
  • Site management
  • On-site construction supervision
  • Project support
  • Taxiway systems/parking areas ca. 18 ha
  • Drainage pipework 1400 ca. 7,000 m
  • Lighting and ductiong systems ca. 12,000 m
  • Drinking water pipework DN 300 ca. 12,000 m
  • basin system
  • Docking system/apron lighting and a 400-Hz system
  • Staff-shelter, GSE-shelter and wash bay
Zweibrücken airport Zweibrücken
RP
  • Condition assessement of aircraft operation surfaces study
  • Renewal of apron surfaces