Herzogenaurach

The development of World of Sports (WoS), Herzogenaurach, district of Erlangen-Höchstadt

The adidas group has made its headquarters on Herzo Base, a former 45 ha heliport. The site had been used by the military for more than 70 years. Every building, the traffic infrastructure and all other infrastructure were converted for their new purpose.

The entire infrastructure, such as sewers, water pipes, medium and low voltage systems, communications and IT technology, district heating and traffic infrastructure were rehabilitated, upgraded or replaced, to meet the new requirements.

Services provided by igr

  • Consultancy
  • Project leadership/Project management
  • Overall coordination
  • On-site construction supervision
  • Planning of open spaces
  • Planning of engineering constructions
  • Planning of traffic infrastructure
  • Planning of technical equipment
  • Design and construction surveying
  • As built documentation

Key figures

  • ca. 3,200 m water pipelines
  • ca. 3,800 m storm water pipes
  • ca. 4,200 m waste water pipes
  • ca.1,2300 m accessible media ducting
  • ca. 14,500 m² traffic infrastructure
  • ca 3,400 m district heating and refrigeration pipes
  • ca. 6,800 m ducting system
  • ca. 3,300 m² parking places
  • ca. 2,600 m ducting system for communication and development