Description City Services Characteristics
Badenheim
RP
• Landschaftspflegerischer Begleitplan
• Verkehrsanlagen
• Ingenieurbauwerke
• Entwurfsvermessung
• Freianlagen
Cable route planning for a solar park at Eggersdorf near Müncheberg Müncheberg
BB
  • Planning of engineering structures
  • Planning of techical equipment
  • Authorisation applications: federal roads, district roads, gas pipes
  • Land crossing rights for the entire route
  • Implementation planning with surveying stake list for the cable route
  • Nature conservation expert evaluation (impact regulation)
  • Route search for 5 options
  • Land-crossing rights for 34 plots of land
  • Crossing authorisations for federal roads, district roads,   ducts for gas pipes
  • Ecological study of the entire route
  • Application for protected status authorisation
  • 3 horizontal flush drillings in the crossing zones
  • Implementation planning for the cable route with ca. 13.5 km cable length and ca. 20 connection sleeves
  • 20 kV medium voltage cable 2x3x1 NA2XS(F)2Y 630 mm²
Enkenbach-Alsenborn landscape plan Enkenbach-Alsenborn
RP
  • Land use development plan
  • Landscape planhaftsplan
  • Biotope types mapping
  • Compatible data for the GIS-pad program
  • Investigation area (area of the association of municipalities ): 6,417 ha
Upgrading of the Dörrmoschel through road (L 386 / L 379 / K 6 ) Dörrmoschel
RP
  • Landscape management supplimentary plan with species protection legal evaluation (specially protected species and strictly protected species)
  • Planning of traffic facilities LP 1-5
  • Design surveying
  • Localised drainage
  • Total upgraded section 1.1 km
  • Investigation area ca. 7 ha
Airport development, Ramstein/NSG Spießwald-Streitwiese Ramstein-Misesenbach
RP
  • Planning/landscaping
  • On-site construction supervision
  • Ecological site management of the species protection measures
  • Environmental impact Assessment (UVS)
  • Landscape management supplimentary plan
  • FFH impact examination
  • Accompanying authorisation process in line with s. 6 of the Aviation Act (LuftVG)
  • Application in line with s. 31 of the Water Resources Act (WHG) for waterway developments
  • Clearing application in line with s. 45 of the National Forest Act (BWaldG)
  • Specialist planning of accompanying expedited proceedings
  • Maintenance and development plans
  • Design and construction surveying
  • As-build documentation
  • Construction supervision
  • Protective designation observance of water in line with the Environmental Impact Assessment Act (UVPG)
  • Planning
  • Monitoring
  • Intervention area ca. 400 ha
  • Investigation area ca. 7,700 ha
  • 12 ha of grass seed RSM 7.1.2 (Standard with herbs)
  • 15 ha grass seed RSM 7.3.1 (damp situations)
  • 68 ha special mixture RSM 7.3.1 (including Sanguisorba officinalis/red thunder)  
  • 11 ha special mixture RSM 7.2.2 (including Calluna vulag-ris/heather, Nardus stricta/matgrass)
All-year project, Rennsteig
  • Exemption application
  • Landscape management supplimentary plan (LBP)
  • Ecological construction supervision
  • Requires impacts totalling ca. 1 ha
  • Extensive compensaton inside the plan areas
  • External compensation activities: ca. 0.5 ha
Alteration to the Großheubach land use development plan Großheubach
BY
  • Environmental report
  • Land use development plan alteration
  • Plan area 9.4 ha
Alteration to the land use development plan to update "Windenergie" Pirmasens
RP
  • Overall site strategy for windenergy"
  • Environmental report
  • Species protection law examination
  • 143.04 km² total area
Bachstelzenweg waste water sewer in Erfurt Erfurt
TH
  • Nature conservation expert evaluation
  • Exemption from Landscape Protection Area protection
  • Authorisation planning
  • Complex work undertaken in a town centre
  • 3 construction phases
Biotope development (still and flowing waterways, forest regeneration/development) at Miesau Miesau
RP
  • Maintenance and development planning
  • Authorisation planning
  • Landscape management supplimentary plan
  • 12 individual activity areas, with in total 52 ha
Cable route planning for a solar park at Boms-Haggenmoos Boms-Haggenmoos
BW
  • Planning of engineering structures
  • Planning of techical equipment
  • Authorisation applications railway line 4551
  • Authorisation applications L286
  • Nature conservation expert evaluation (impact regulation)
  • Crossing application for railway line 4551
  • Crossing application for main road 286
  • 2 horizontal flush drillings in the crossing areas
  • Cable length: ca. 900 m
  • Cable specification: 1 x 150 mm² NA2XS(F)2Y
Cable route planning for a solar park at Albessen Albessen
RP
  • Planning of engineering structures
  • Planning of techical equipment
  • Route search with four options
  • Authorisation applications: rail, waterways, motorways, main roads, district roads, gas pipes
  • Land crossing rights for the entire route
  • Implementation planning with surveying stake list for the cable route
  • Nature conservation expert evaluation (impact regulation)
  • Route search for 4 options
  • Land-crossing rights for 77 plots of land
  • Ecological study of the entire route
  • Application for protected status authorisation
  • 9 horizontal flush drillings in the crossing zones
  • Implementation planning for the cable route with ca. 9.5 km cable length and ca. 30 connection sleeves
  • 20 kV medium voltage cable 3 x 1 x 185 mm² NA2XS(F)2Y
Commercial and Special area (off-motorway services) "An der A63" at Wörrstadt Wörrstadt
RP
  • Environmental report
  • Site development plan
  • Land use development plan alteration
  • Urban development strategy
  • Traffic facilities
  • 12.5 ha total area
Constructed wetland in Marienthal, extension of constructed wetland in Würzweiler, collective waste water treatment plant in the Gerbach and St. Alban municipalities Rockenhausen
RP
  • Outdoor facilities planning
  • Project management
  • Landscape management supplimentary plan
  • Engineering constructions planning
  • Technical equipment planning
  • Design and construction surveying
  • On-site construction supervision
  • As-built documentation
  • 38 trees 1st and 2nd order (of size)
  • 1,200 m² wooded areas
Construction of a road and a footpath at the entrance gate of Ramstein Air Base Ramstein
RP
  • Biotope types mapping
  • Environmental impact assessment
  • Special evaluation with regard to species protection (§44 BNatSchG)
  • Determination of additional financial compensation
  • Documentation from 35 ha near-nature forest conversion as compensation
Construction site „Kleine Hahl" (first construction phase) in Lörzweiler Lörzweiler
RP
  • Site development plan
  • Surveying
  • Rain water management strategy
  • Development planning
  • Road construction
  • Project management
  • Project development
  • ca. 3 ha total area
  • ca. 0.3 ha outdoor facilities
Construction site "Am Hohrecher Weg/Auf Kipp" housing development in Meisenheim Meisenheim
RP
  • Outdoor facilities planning
  • Site development plan
  • Development planning
  • Construction supervision
  • Project development/marketing
  • 9,000 m² open land
  • 125 trees planted
  • 400 shrubs planted
  • Playground
Construction site "Der vordere Kieselberg" in Gensingen Gensingen
RP
  • Site development plan
  • Environmental management planning contribution
  • Species protection law preliminary investigation
  • Environmental report
  • Alteration to the land use development plan
  • 48.6 ha total area
  • 5 ha construction site ""Der vordere Kieselberg""
Construction site "Hinter der Bahn" housing development in Wörrstadt Wörrstadt
RP
  • Environmental report
  • Site development plan
  • Traffic facilities
  • Technical development planning
  • Construction surveying
  • Plan area of 8 ha
  • Taking account of renaturisation planning
  • 1 ha flood plains
Construction site "Kenner Ley II" housing development in Kenn Kenn
RP
  • Feasibility study
  • Site development plan
  • Needs assessment/vacant plots evaluation
  • Environmental report
  • Species protection, birds/bats
  • Evaluation of immissions to the isolated farm?
  • Design surveying
  • Technical development planning
  • Outdoor facilities
  • On-site construction supervision
  • Health and safety coordination
  • Development of 115 building plots
  • ca. 8.4 ha
Construction site "Nahegärten“ in Gensingen Gensingen
RP
  • Site development plan
  • Environmental report
  • Alteration of the partial land use development plan
  • As-built surveying
  • Species protection law preliminary investigation
  • 3.4 ha total area
Construction site "Oberer Geißberg" in Otterberg Otterberg
RP
  • Site development plan alteration
  • Environmental report/expert report  
  • Expert report on noise
  • Surveying
  • Rain water management strategy
  • Development planning
  • Civil engineering
  • Outdoor facilities planning
  • Road construction
  • Construction supervison
  • Project management
  • Project development
  • 8.9 ha total area
  • 105 plots
Construction site "Ökopark Am Wiesbach" in Gensingen Gensingen
RP
  • Site development plan
  • Expert contribution on nature conservation
  • Environmental report
  • 1.1 ha total area
  • 13 building plots
Construction site "Rambusch - Kirchtal" in Otterbach Otterbach
RP
  • Site development plan alteration
  • Environmental report/expert report  
  • Rain water management strategy
  • Development planning
  • Civil engineering
  • Outdoor facilities planning
  • Road construction
  • Construction supervison
  • Project management
  • Project development
  • 17 ha total area
  • 117 plots
  • 10 commerial areas
Construction site "Schlossbergblick“ housing development in Neuhemsbach Neuhemsbach
RP
  • Environmental report
  • Site development plan
  • Application for a derogation according to s.30 of the German nature conservation law (BNatSchG)
  • Technical development plan
  • Construction surveying
  • 3.9 ha total area
  • 50 plots
Conversion of the B 272/L 540 junction to a roundabout in Hochstadt Hochstadt
RP
  • Expert contribution on species protection
  • Site recording of birds
  • Expert contribution on nature conservation
  • Planning of traffic facilities
  • Investigation area: ca. 55 ha
  • 40 European bird species in accordance with the Bird Protection Directive (VSRL)
Conversion of the junction to a roundabout in Konz (B51/L 138) Konz
RP
  • Landscape management supplimentary plan
  • Design surveying
  • Planning
  • Road marking and signage plan
  • Plan area ca. 5 ha
Development of a commercial and industrial park "Südlicher Gutsweg" in Eisfeld Eisfeld
TH
  • Application for afforestation
  • Woodland clearing application
  • FFH preliminary investigation
  • Traffic facilities
  • Technical development planning
  • Outdoor facilities
  • Alteration to the site development plan
  • Impact regulation
  • Woodland clearing area 3.27 ha
Environmental impact assessment preliminary examination/environmental management position statement with regard to a water law application at Ramstein Air Base Ramstein
RP
  • Water law application/environmental impact assessment
  • preliminary investigation
  • FFH-Study
  • ca. 150 ha Investigation area
  • 6 wells/ground water extractions
Extension of the Grünstadt motorway junction (B 271/ A 6), widening of the junction and by-pass for the north-south traffic of the (old) B 271 at the roundabout Grünstadt
RP
  • Landscape management supplimentary plan
  • Design surveying
  • Planning of traffic facilities
  • Acoustic calculations
  • Bypass at the roundabout
  • 31.8 ha investigation area
FFH site "Westricher Moorniederung“, federal and state estates Bruchmühlbach-Miesau
RP
  • Maintenance and development planning
  • Authorisation planning in line with s. 68 of the Water Resources Act (WHG)
  • Landscape management supplimentary plan
  • In total ca.130 ha
  • Forest conservation measures with emphasis on rewetting/fen development  
  • 2,152 ha FFH area 6511-301 "Westricher Moorniederung“
Forestry activities on Federal sites Kaiserslautern
RP
  • Maintenance and development planning
  • Authorisation planning
  • Landscape management supplimentary plan
  • 8 individual activity areas with a total of 35 ha
Forestry eco-account planning on federal estates near Kaiserlautern Kaiserslautern
RP
  • Site recording of the biotope types and FFH habitat types
  • Compillation of the basic data and the landscape management data
  • Development of pools
  • Background work for short expert report on nature protection
  • Environmental management balancing in eco-account
  • 1,755 ha investigation area, of which
  • 1,250 ha Ramstein Air Base
  • 105 ha Sembach property
  • 400 ha Vogelweh property
Local heating network in Enkenbach-Alsenborn Enkenbach-Alsenborn
RP
  • Planning
  • Tendering
  • Expert contribution on nature conservation
  • 5 km route length
  • Investigation area ca. 6 ha
  • On both sides of the constructed route a strip of 10 m
Master plan for water supply and waste water disposal for Albania Tirana
  • Data collection  
  • Data analysis
  • Calculations
  • Creation of a nationwide GIS
  • GIS training for staff of the responible ministries
  • Determination of necessary investments
  • Outlining of the projects
  • Prioritisation of the actions required
  • Environmental impact assessment
  • Site acquisition - areas of conflict
  • Analysis of over 1,700 water and waste water systems
  • Indentification of over 800 projects
  • ca. 3 million inhabitants
  • ca. 600 investment project in the field of waste water
New build of a 20 KV power line in Ilmenau-Geraberg Geraberg
TH
  • Landscape management supplimentary plan
  • Application for exemption authorisation for nature and landscape
  • FFH relevance estimation
  • Outdoor facilities
  • Technical equipment for power supply
  • Technical and ecological construction supervision
  • 20 kV-power line ca. 11.7 km underground section
  • Plan area 58.5 ha affected by five s. 18 Thüringen nature law (ThürNatG) biotopes:
  • Damp biotope northeastern Unterpörlitz (320 m section)
  • Reichenbach (50 m section) und Zahme Gera (20 m section)
  • dry warm locations at Bahndamm (50 m section)
  • Basiphiler dry/half-dry grass (100 m section)
  • Crossing of 2 FFH areas 578 ha and 536 ha)
New build of a cycle path Freudenthal to Wandersleben Freudenthal-Wandersleben
TH
  • FFH preliminary evaluation
  • Landscape management supplimentary plan
  • Road construction planning
  • Design surveying
  • New build of the cycle path ca. 1.2 km length (of which 500 m in FFH zone)
New build of an elevated water tank in Riol Riol
RP
  • Water law authorisation s. 47 State Water Act (LWG)
  • Outdoor facilities planning
  • Health and safety coordination
  • Volumes of 2 individual tanks, each 250m³
New build of drinking water pipework in Emsetal-Winterstein Emsetal-Winterstein
TH
  • FFH preliminary examination
  • Landscape management supplimentary plan (LBP)
  • Ecological construction supervision
  • Technical planning
  • Design surveying
  • ca. 1 km of pipework inside the Natura 2000 areas
  • Plan area ca. 8.5 ha
  • Investigation area of bird protection area 70 ha
Outside facilities at the eco-friendly swimming pool in Rockenhauen Rockenhausen
RP
  • Planning of outdoor facilities
  • Site management
  • On-site construction supervision
  • 1,600 m² turfed areas
  • 1,500 m³ soil grading
  • 360 m² areas of paths and steps
  • 150 m waste water and rainwater sewers
  • 20 m box drains
Ox bow lake development on the Glam, amphibian re-location Bruchmühlbach-Miesau
RP
  • Preparation of the service description
  • Construction supervisionBauüberwachung
  • Project coordination
  • Project documentation
  • Floristic mapping of transition moor  
  • Implementation of the regulations from the SGD Süd exemption authorisation in line with s. 43 Federal Nature Conservation Act (BNatSchG) for the reshaping of the moor  
  • Evaluation of the amphibian stock development on the transition moor
  • Monitoring
  • Relocation of over 11,000 animals (crested newts, moor frogs, etc.)
Partial land use development plan for designated areas for the extraction of raw materials in the municipality of Sprendlingen-Gensingen Sprendlingen-Gensingen
RP
  • Partial land use development plan
  • Environmental report
  • Area 1, Appelgarten: 17.2 ha
  • Area 2, Johannesweg: 17.1 ha
  • Area 3, Am Kreuznacher Weg: 47.5 ha
  • Area 4, Kisselberg: 53.3 ha
  • St. Johann: 21.8 ha
  • Area of the association of municipalities: 5597 ha
Partial land use development plan for Glan-Münchweiler "Windenergie" Glan-Münchweiler
RP
  • Environmental report
  • Overall site strategy for wind energy
  • Land use development plan regarding wind energy
  • Species protection law examinatino
  • 9 Special area for wind farms
  • Total size of special area for wind farms: 403 ha
Partial land use development plan for Rockenhausen "Windenergie" Rockenhausen
RP
  • Overall site strategy for windenergy"
  • Environmental report
  • Species protection law examination
  • 140.77 km² total area
Rain water retention basins "Am Schwimmbad" and "Lauberweg" in Hettenleidelheim Hettenleidelheim
RP
  • Landscape management supplimentary plan (LBP)
  • Environmental impact assessment - preliminary check
  • Outdoor facilities planning
  • Lauberweg, retention volume: 6,500 m³
  • Am Schwimmbad, retention volume: 6,600 m³
Recreation of the Morbach wetland at Ramstein-Miesenbach Ramstein-Miesenbach
RP
  • Authorisation planning in line with s. 68 Wate Resources Act (WHG)
  • Maintenance and development planning
  • Area and construction surveying
  • Outdoor facilities planning
  • Exemption application in line with s. 30 Nature Conservation Act (BNatSchG)
  • 5.9 ha area of activity
  • 0.5 ha wetted area
Renaturisation of the Glan near Ramstein-Miesenbach Ramstein-Miesenbach
RP
  • Maintenance and development planning
  • Authorisation planning in line with s. 68 Water Resources Act (WHG)
  • Planning outdoor facilities
  • On-site construction supervision
  • Exemption application in line with s. 30, Nature Conservation Act (BNatSchG)
  • Area and construction surveying
  • Implementation planning
  • Contaminated sites investigation (not used Nato-pipeline)
  • Outdoor facilities planning
  • Support with land readjustment procedures
  • Mapping of the structural quality of the waterway (GSG)
  • Monitoring following implementation
  • 6.5 ha area of activities (900 m section)
Renaturisation of the Echaz relief canal in Lichtenstein Lichtenstein
BW
  • Water law authorisation/renaturisation planning for waterway development for Echaz relief canal in line with s. 31 Water Resources Act (WHG)
  • Environmental impact assessment -preliminary examination
  • Site development plan
  • Environmental management supplimentary plan (LBP)
  • Design surveying
  • Planning (traffic facilities, water management)
  • ca. 160 m Renaturisaton section
  • stable water flow 60 l/s
  • Guaranteed flood relief of 6.5 m³/s
Renaturisation of the Kahlenbach in Bekond Bekond
RP
  • Renaturisation strategy
  • Application for support from the MIP
  • Renaturisation planning
  • On-site construction supervision
  • 1 km Renaturisation length
  • ca. 120 m uncovering of an existing complete piping section
  • Lengthening of the stream by ca. 90 m through additional meanderings
Renaturisation of the Mohrbach near Ramstein-Miesenbach Ramstein-Miesenbach
RP
  • Maintenance and development planning
  • Authorisation planning in line with s. 68 Water Resources Act (WHG)
  • Planning outdoor facilities
  • On-site construction supervision
  • Exemption application in line with s. 30, Nature Conservation Act (BNatSchG)
  • Area and construction surveying
  • Implementation planning
  • Contaminated sites investigation
  • Outdoor facilities planning
  • Mapping of the structural quality of the waterway (GSG)
  • 7.5 ha area of activities along the Mohrbach (2.000 m section)
Renaturisation of the Moschelbach/flood retention in Gehrweiler Gehrweiler
RP
  • Outside facilities planning
  • Water law authorisation planning
  • Environmental impact assessment -preliminary examination
  • Environmental management supplimentary plan
  • Area surveying
  • Coordination with all supply and disposal organisations
  • On-site construction supervision
  • Health and safety coordination
  • Traffic facilities planning
  • ca. 4.000 m³ earthmoving for flood protection dam, retention trough and waterway modelling
  • ca. 3 ha Plan area
  • Retention trough for 2,200 m2 (assessment basis 10 year rain event) with near-nature embankments (1:3)
  • Renaturisation section of 400 m with mit insertion of structural elements
  • Removal of two culverts in the waterway bed
  • Upgrading and renewal of traffic facilities and access roads
Renaturisation of the Mühebach in Bingerbrück Bingen
RP
  • Options investigation for the planning permission application
  • Cross bar:evidence of the structural stability/Stability of the large bolder embankments  
  • Water law planning permission with evidence of the    hydraulic performance of the open ditches and the pipe-lined stream profiles
  • Implementation planning
  • Tendering and assistance with the contract awarding
  • On-site construction supervision
  • 67 m stream piping DN 2000
  • Crossbar as large bolder weir in the overflow of the Mühebach with evidence of the structural integrity/stability of the stone weir
  • Removal of a dry stone wall, slope stabailisation and floor stabalisation in the stream bed
Renaturisation of the Neuwoogbach near Ramstein-Miesenbach Ramstein-Miesenbach
RP
  • Maintenance and development planning
  • Authorisation planning in line with s. 68 Water Resources Act (WHG)
  • Planning outdoor facilities
  • On-site construction supervision
  • Exemption application in line with s. 30, Nature Conservation Act (BNatSchG)
  • Area and construction surveying
  • Implementation planning
  • ca. 3.0 ha area of activities along the Neuwoobach (800 m section)
Renaturisation of the Schwarzbach between BAB62 and L 477 near Thaleischweiler-Fröschen Thaleischweiler-Fröschen
RP
  • Renaturisation strategy
  • Research hydraulic and species protection law fundamentals
  • Cost estimate
  • 500 m Renaturisation/creation of a totally new streambed
Renaturisation/creation of landscaped pond in Ruthweiler Ruthweiler
RP
  • Strategy for creation of landscaped pond and outside facilities planning
  • Civil engineering
  • Hydro-technical calculation
  • Area surveying
  • 1,300 m² pond
  • 1,200 m² playground area
  • 5,170 m² grass and wooded areas
  • 450 m² barbecue area
Renaturisation/relocation of the Seebach in Nürtingen Nürtingen
BW
  • Authorisation planning in line with s. 31 Water Resources Act (WHG)
  • Implementation planning, near-nature waterway development
  • Implementation planning, B313 road relocation
  • 365 m Renaturisation section
Renaturisation/water retention, Schwarzbach in Ramstein-Miesenbach Ramstein-Miesenbach
RP
  • Exemption application in line with s. 30 Nature Conservation Act (BNatSchG)
  • Maintenance and development planning
  • Area and construction surveying
  • Hydraulic calculation
  • Authorisation planning in line with s.68 Water Resources Act (WHG)
  • Outdoor facilities planning
  • Support with land readjustment procedures
  • 39 ha renaturisation area
  • 1,700 m of renaturisation sections
Retention/rewetting of the small valley at the Westpfalzhalle in Niederkirchen Niederkirchen
RP
  • Landscape management planning contribution
  • Outdoor facilities planning, LP 1-9
  • Authorisation planning in line with s. 31 Water Resources Act (WHG)
  • Hydraulic calculation
  • ca. 0.1 ha rewetting area
Ring road junction Büdesheim–Ost between the technical college and the B 9 in Bingen am Rhein Bingen am Rhein
RP
  • Site development plan
  • Landscape management supplimentary plan
  • Design surveying
  • Planning of traffic facilities
  • On-site construction supervision
  • 77 ha investigation area
  • 700 m new build section
Risk assessment /detailed investigation at Ramstein Air Base, in accordance with the Federal Soil Protection Act and Ordinance (BBodSchG, BBodSchV) Ramstein
RP
  • Risk assessment
  • Detailed investigation in line with BBodSchG, BBodSchV and Alex-Lists
  • Project management including responsibility for all commercial services: core drilling, ground water monitoring points, small ramming drilling, laboratory, munitions surveying
  • Strategy for ground water treatment
  • Health and safety coordination
  • Construction supervision
  • 10 x Core drilling up to ca. 20 m deep
  • 18 x construction of ground water measuring points up to 30 m deep
  • 136 x small ramming drilling up to 5 m Tiefe
  • 5 subplots on the entire airport site
Risk assessment /detailed investigation in Landstuhl, in accordance with the Federal Soil Protection Act (BBodSchG) Landstuhl
RP
  • Risk assessment
  • Detailed investigation in line with BBodSchG, BBodSchV and Alex-Lists
  • Project management including responsibility for all commercial services
  • Strategy for ground water treatment
  • Health and safety coordination
  • Construction supervision
  • 7 x Core drilling up to ca. 20 m deep
  • 3 x construction of ground water measuring points up to 30 m deep
  • 35 x small ramming drilling up to 5 m Tiefe
  • 4 subplots on a site with a total area of ca. 20 ha
Section alteration to the land use development plan for Grünstadt "Erweiterung Krankenhaus" Grünstadt
RP
  • FFH preliminary assessment
  • Species protection law preliminary assessment
  • Plan area 1.6 ha
Site back-filling/waterway restoration at Schmidts Gründchen in Rockenhausen Rockenhausen
RP
  • Ecological construction supervision
  • Landscape management supplimentary plan
  • Landscaping planning
  • Design surveying
  • Compilation of planning applications
  • 8.45 ha Investigation area
  • 2,750 m³ soil back filling
  • Recording 16 soil profiles
Site development plan core area, traffic facilities/retail "Stadtmitte Alte Hütte" in Herdorf Herdorf
RP
  • Site developmpent plan
  • Green spaces plan
  • Environmental report
  • Traffic facilities planning
  • 5.1 ha total area
Site development plan for "Am Haselhecker Weg" biomass power/heating station with 2nd alteration of site development plan for "Am Mühlweg" in Enkenbach-Alsenborn Enkenbach-Alsenborn
RP
  • Economic efficiency evaluation
  • Site development plan
  • Expert contribution on nature conservation
  • Rain water management
  • Area surveying
  • Civil engineering
  • Combustion and plant technology
  • Technical building equipment
  • Project management
  • District heating
  • 1.6 ha Plan area
  • 1.23 ha of external compensation
Site development plan for "Gemeinbedarfsgebiet" in Schweich Schweich
RP
  • Environmental report
  • Site development plan
  • Expert contribution on species protection, birds, bats
  • Inpact mitigation regulation, nature conservation
  • Construction surveying
  • Technical development planning
  • On-site construction supervision
  • Health and safety coordination
  • Plan area 4.9 ha
Site development plan for "Über Rück" (2nd construction phase) housing development in Harxheim Harxheim
RP
  • Site development plan
  • Environmental management planning contribution
  • Acoustic investigation
  • Processing the objections in the course of the participation of public interest groups
  • Development planning
  • Project coordination
  • Outdoor facilities planning
  • construction supervision
  • 3.14 ha total area
  • 53 plots
Site development plan for "Zellerberg" housing development in Mehring Mehring
RP
  • Site development plan
  • Expert contribution on nature conservation
  • Environmental report
  • Expert report on noise
  • Rain water management
  • Development contractor (Palatia Ingenieur- und Städtebau GmbH)
  • 10.7 ha total area
  • 98 building plots
Species protection legislation preliminary investigation regarding the partial land use development plan "Windenergie" in Grünstadt Grünstadt
RP
  • Site inspections March to June on the investigation area (3,500 ha)
  • Extended site inspections for wind power sensitive bird and bats (ca. 10,000 ha)
  • Species protection law relenvance test
  • Accompanying consultation about further procedures
  • Participation and preparation/follow up scoping schedule
  • Investigation area of ca. 3,500 ha
  • Extended inspection area of ca. 10,000 ha
Species protection on Ramstein Air Base Ramstein-Misesenbach
RP
  • Breeding birds registration and further occurence
  • Emphasis on the lapwing and little ringed plover
  • Development of open-land management with heather
  • Mat grass grassland development and long-grass management on medium to fresh-moist localities
  • 350 ha investigation area
  • Focus on lapwings (18 breeding pairs recorded) and little ringed plovers (11 recorded)
  • Further open land species (including northern wheatears, winchats,     meadow pipits and sandpipers)
Study about threatened and endangered species in Pirmasens Pirmasens
RP
  • Systematic fauna mapping
  • Photo documentation
  • Species listing/description of the current situation
  • Management planning
  • 6 ha Bann A and B air/telecommunication station
  • 60 ha area of the Husterhöher barracks (and surrounding area)
Study of the biotope network with monitoring programme at Ramstein Air Base Ramstein
RP
  • Mapping of amphibians, reptiles and fish
  • Development of a biotope network management plan
  • 400 ha investigation area
Study of threatened and endangered species in FFH site "Westricher Moorniederung" Ramstein-Misesenbach
RP
  • Mapping of biotypes and special bird species
  • Categorisation of each main focus of the existing 2002 study of threatened and endangered species
  • Development of specific goals and measures for species and habitats
  • Creation of data in SDS-Format
  • 150 ha main investigation area
Upgrade/expansion of the Nürburgring Nürburg
RP
  • Project coordination faunistic expert contributions/Species protection law examination
  • Environmental report as per Environmental Impact assessment law (UVPG) for the site development plan
  • Environmental impact assessment
  • Regional planning procedure
  • Planning deviation permission rocedings
  • Alteration of the land use development plan
  • Site development plan for boulevard/village and golf course
  • Expert contributions on nature conservation
  • Application for exemption
  • Site development plan for golf course
  • Traffic   and car parking strategy
  • Water management Expert report
  • Preliminary design for upgrading road junctions
  • application for discharge permit
  • forest clearing application
  • Planning landscaping
  • Ecological construction supervision
  • Investigation area 2,700 ha
  • Focus on the following species: grasshoppers, bats, lynx/wildcats, birds, butterflies
  • 2 golf courses totalling ca. 166 ha (18 hole courses)
Upgrading of the K 84 and K85 in the Reichsthal through road Reichsthal
RP
  • Landscape management supplimentary plan
  • Design surveying
  • Planning of traffic facilities
  • 570 m upgraded length of the K 84/K 85
  • 5 ha investigation area
Upgrading of the K24 between Körborn and Kusel-Diedelkopf Körborn
RP
  • Design surveying
  • Biotope type mapping
  • Landscape management supplimentary plan
  • Planning of traffic facilities
  • Drainage planning
  • 1,900 m upgraded length of the K 24 with accompanying footpath and drainage of the traffic facilities
  • Road drainage and the adjacent embankments
Upgrading of the L 400 between Würzweiler und Brücke Appelbach with a combined foot and cycle path (2 sections) Würzweiler
RP
  • Landscape management supplimentary plan with species protection legal evaluation
  • Planning of traffic facilities
  • Design surveying
  • Drainage planning
  • ca. 1 km upgraded section including a newly constructed combined foot and cycle path
  • ca. 3,700 m² new surface
  • 300 linear metres enlarged riparian strips
Upgrading of the L1085 from Daßlitz to Neumühle, including a through road in Neumühle Daßlitz
TH
  • Landscape management supplimentary plan
  • ca. 400 ha investigation area
  • A variety of biotope types according to s.18 of the Thüringen Nature Conservation Act (ThürNatSchG)
  • Geological protected natural feature
  • Landscape protection area
  • Priority area for nature and Landscape
Upgrading of the L373 and the K 65 in the Kappeln through road Kappeln
RP
  • Landscape management supplimentary plan
  • Planning of traffic facilities
  • Design surveying
  • ca. 795 m upgraded length of the L373
  • ca. 160 m upgraded length of the K 65
Upgrading of the L386 at the Rockenhausen town through road in the Marienthal district Rockenhausen
RP
  • Landscape management supplimentary plan
  • Planning traffic facilities
  • Construction supervision
  • Design surveying
  • Integration of the "Spielleitplanung“ (play encouragement planning) in the design
  • 530 m upgraded section of the L 386 with an accompanying footpath, including drainage of the traffic facilities
  • 2 bus stops with crossing aids
Upgrading of the main roads L2272 and L2699 in Ilmenau Ilmenau
TH
  • Current status analysis
  • Conflict plan
  • Development actions plan
  • Land acquisition plan
  • 2,5 ha Investigation area
Upgrading/new build of a telecommunications line near Hütschenhausen Hütschenhausen
RP
  • Design surveying
  • Applications in line with s.38 of the Water Resources Act (WHG) (Riparian strips) and s. 76-78 WHG (flood plains)
  • Landscape management supplimentary plan
  • FFH preliminary check
  • Species protection law check
  • Check of general protected biotopes in line with s. 30 of the Nation Nature Conservation Act (BNatSchG) and the nature conservation area law
  • Legal regulations
  • Ecological construction supervision
  • 2.7 km upgraded length; 1.7 km new build length
  • 10 x waterway crossing points, 1 x crossing of a railway line and the A6 motorway
  • 30 ha core investigation area, plus ca. 3,000 ha FFH area
Waste water disposal strategy in Zagreb Zagreb
  • Consultancy on waste water/waster water treatment plant
  • Environmental impact study/assessment
  • Velica Gorica
  • Lipovljana
  • Island of Krk
bitte ergänzen…! (JS)
Wind farm in Obernheim-Kirchenarnbach Obernheim-Kirchenarnbach
RP
  • Expert contribution on nature conservation
  • Environmental impact assessment - preliminary investigation
  • Species protection examination/relevance check, phase 1
  • Investigation area 127 ha
  • 2 wind farms
Wind farm in Queiderbach Queidersbach
RP
  • Expert contribution on nature conservation
  • Environmental impact assessment - preliminary investigation
  • Investigaton area 79 ha
  • 1 wind farm
Wind farm in Schauerberg Schauerberg
RP
  • Expert contribution on nature conservation
  • Environmental impact assessment - preliminary investigation
  • Species protection examination, phase 1
  • Investigation area 152 ha
  • 3 wind farms
Wind farm in the town of Bad Schwalbach Bad Schwalbach
HE
  • Location investigation regarding wind energy
  • Land use development plan
  • Environmental report
  • ca. 4.027 ha Investigation area
  • ca. 10,400 inhabitants
Wind farm in Weselberg Weselberg
RP
  • Expert contribution on nature conservation
  • Environmental impact assessment - preliminary investigation
  • Species protection examination/relevance check, phase 1
  • Investigation area 433 ha
  • 9 wind farms
Wind farms near Grosselfingen Grosselfingen
BW
  • Special species protection law examination (saP)
  • 9 potential locations for wind farms
  • Investigation area ca. 600 ha